[AC]
Design Condition:
In General, D.B.: 18℃, R.H.: Less than 60%; 當然亦都要睇件Datacom Equipment環境溫/濕度需求
Gas Purging System要有個手動Exhaust Fan, 因為如果起咗Total Flooding System的話,就要靠呢把Fan嚟清;
計Sensible Load方面,ASHRAE都有比個趨勢估算出嚟,見得出Scientific用既GPU比雲儲存散熱更高;Communication 係最低;
上述係講緊一隻42U櫃既散熱量,42U係咁既樣
1U就即係入一件
有Liquid-Cooled, 呢種玩法就要確保响Dew Point以上防Condense
有Air-Cooled, 通常都係由地板入
Air-Cooled用Computer Room Air Conditioning CRAC Unit
[EL]
詳見 https://elvissharing.blogspot.com/2020/03/el-how-to-plan-design-electricity.html , 都係啲無限備份玩法。
Electrical Busway, 响上面好似電車路軌咁攞電
UPS可能會用有Flywheel嗰種,Wiki話係online方式,養住隻轉緊既飛輪可以頂住30s 等Genset起動, 及見 https://elvissharing.blogspot.com/2020/04/el-uninterruptible-power-supply-ups.html
此外為咗避免EMI Interference, IT cables 走High Level; Power Cable 行Raised Floor;
要因應BEEO裝Digital Power Analyzer 計住電流、電壓、功率 (7.7 Metering & Monitoring Facilities, Main Circuit, Feeder & Sub-main Circuit)
[FS]
Total Flooding System, see https://elvissharing.blogspot.com/2020/04/fs-gaseous-extinguishing-system.html
Very Early Smoke Detection Apparatus, see https://elvissharing.blogspot.com/2020/04/fs-automatic-fire-alarm-system.html , 但留意呢個System係唔會用嚟踢著FM200, 只係為咗早啲知
[MISC]
Water Leakage Detection (Linear Type)
Structured Cabling System
有Copper Cable & Fiber, 兩者各有優勢所以响Data Center度會混合嚟用。放線方式有國際標準或ER要求。
Optical Fiber: 輕、距離遠、速度快;
Copper Cable: 更可靠、响Data Center裡面功率低散熱少耗電少;
Cat5, Cat5e, Cat5 分別
(鳴謝﹕紅豆;Source: 2019 ASHRAE Handbook Application - Chapter 20)
1U就即係入一件
有Liquid-Cooled, 呢種玩法就要確保响Dew Point以上防Condense
有Air-Cooled, 通常都係由地板入
Air-Cooled用Computer Room Air Conditioning CRAC Unit
詳見 https://elvissharing.blogspot.com/2020/03/el-how-to-plan-design-electricity.html , 都係啲無限備份玩法。
Electrical Busway, 响上面好似電車路軌咁攞電
UPS可能會用有Flywheel嗰種,Wiki話係online方式,養住隻轉緊既飛輪可以頂住30s 等Genset起動, 及見 https://elvissharing.blogspot.com/2020/04/el-uninterruptible-power-supply-ups.html
要因應BEEO裝Digital Power Analyzer 計住電流、電壓、功率 (7.7 Metering & Monitoring Facilities, Main Circuit, Feeder & Sub-main Circuit)
Total Flooding System, see https://elvissharing.blogspot.com/2020/04/fs-gaseous-extinguishing-system.html
Very Early Smoke Detection Apparatus, see https://elvissharing.blogspot.com/2020/04/fs-automatic-fire-alarm-system.html , 但留意呢個System係唔會用嚟踢著FM200, 只係為咗早啲知
[MISC]
Water Leakage Detection (Linear Type)
Structured Cabling System
有Copper Cable & Fiber, 兩者各有優勢所以响Data Center度會混合嚟用。放線方式有國際標準或ER要求。
Optical Fiber: 輕、距離遠、速度快;
Copper Cable: 更可靠、响Data Center裡面功率低散熱少耗電少;
Cat5, Cat5e, Cat5 分別
你好,我想問下如果DATA CENTER個CRAC機壞左,無法制冷和保持濕度。在確保Data Center能正常運作的情況下,有咩臨時措施可以做?如何進行維修?有咩預防措施可以改善?
回覆刪除所有DC的CRAC都係N+1
刪除壞左台咪行standby
Btw今時今日無DC會做18度出風,咁做個PUE會好高,今時今日個個場都話自己PUE below 1.5。行18度出風個PUE應該都最少2,咁樣無人會租你個場。
回覆刪除其實DC design重點係 Tier/Rated level,downtime同PUE,再唔係就要講埋個場係做wholesale定colo,場主定個IT load density係幾多,甚至要唔要留位做132V substation。基本上一般BS consultant係唔會識做,做左個design出來都未必真係適合。
回覆刪除